FALL TO PLAN: NEW YEAR TO BUILD

ADU renovation in Mill Valley designed by Marin interior designer Studio SQUIRE featuring matte black door framing, matte black railings, wood steps, and stucco facade

When most people think about renovating their home, they picture the day construction begins. The excitement of demolition, new cabinetry being installed, or the first coat of paint going on the walls often feels like the true starting point.

In reality, the best renovations begin months before any of that happens.

The projects that feel the smoothest, stay on schedule, and result in the most thoughtful homes are the ones that invest in planning first. That's why, at Studio SQUIRE, we encourage clients who hope to renovate next year to begin the design process in the fall.

Starting now doesn't mean living in construction through the holidays. It means using the quieter months to thoughtfully design your home, assemble the right team, and prepare every detail so construction can begin with confidence after the new year.

design comes before construction

A successful renovation is built on decisions made long before demolition ever starts.

During the design phase, we're doing far more than choosing beautiful finishes. We're rethinking how your home functions, refining floor plans, developing custom details, coordinating lighting and electrical plans, sourcing materials, preparing construction drawings, and ensuring every decision supports the overall vision.

This is where your renovation truly takes shape.

When construction begins with a fully resolved design, contractors can focus on building instead of waiting for decisions. That creates a more organized job site, fewer surprises, and a much smoother experience for everyone involved.

why fall is the sweet spot

Every renovation has two distinct phases: design and construction. Fall is uniquely suited for the design phase because it provides the time needed to thoughtfully prepare every aspect of the project before construction begins after the new year.

As the design develops, we're refining plans, selecting materials, interviewing contractors, and coordinating with consultants. It's also when permit drawings are prepared and submitted. Depending on the municipality, permitting can take anywhere from a few weeks to several months, so starting in the fall allows that process to unfold without delaying construction.

At the same time, many of the Bay Area's best contractors begin filling their schedules for the year ahead. Beginning early gives us the opportunity to build the right team and coordinate timelines before everyone's calendars are full.

By the time the new year arrives, the design is complete, permits are well underway and construction can begin with a clear plan instead of a long list of unfinished decisions.

Marin County interior designer, Michelle Squire choosing samples

good design takes time

The homes that feel the most personal are rarely built from rushed decisions.

During the design process, we're sourcing handcrafted tile, comparing natural stone slabs, reviewing cabinetry details, testing finishes in different lighting, and refining layouts until every decision feels intentional. It's a collaborative process that allows ideas to evolve and ensures each selection supports the overall vision for the home.

Many of these materials also require time to produce. Custom cabinetry, handcrafted tile, specialty plumbing fixtures, decorative lighting, and bespoke furnishings often have lead times of several weeks or even months. Beginning the design process in the fall allows us to make selections thoughtfully and order materials well before they're needed, so production can happen alongside the early stages of construction rather than delaying them.

Instead of making compromises because of time constraints or product availability, we're able to create a home that feels layered, cohesive, and deeply personal, all while keeping the construction schedule moving smoothly.

how it all comes together

For many projects, the process begins with an initial consultation in early fall, followed by several months of design development, material selections, construction drawings, and contractor collaboration.

Permit applications are submitted as drawings are finalized, while long-lead materials are ordered and coordinated alongside the construction schedule.

When the new year arrives, the project is ready to move seamlessly into construction with a clear plan, an experienced team, and materials already in motion.

Every renovation is different, but thoughtful preparation always creates a stronger foundation for what's ahead.

Kitchen renovation in Kentfield designed by Marin interior designer Studio SQUIRE featuring hana sky quartz, tile backsplash, brass hardware, wood stools, and pendant lighting

planning your renovation with studio squire

The homes that feel the most timeless rarely happen by accident. They're the result of thoughtful planning, intentional decisions, and a design process that values quality over urgency.

If a kitchen renovation, primary suite, or whole home transformation is on your wish list for the coming year, now is the perfect time to begin.

At Studio SQUIRE, we believe great homes are designed with purpose, built with care, and planned well before construction ever begins. Starting this fall means you'll enter the new year ready to build, not still figuring out where to start.

 